Anderzack-Pitzen Construction, Inc.
Safety First - Safety Always

© 2013 - Anderzack-Pitzen Construction, Inc.  Terms & Conditions

Established 1992
An Equal Opportunity Employer
Phone:  (419) 644-2111  Fax:  (419) 644-2110

Put-In-Bay, Ohio is located on the picturesque South Bass Island on Lake Erie just north of Port Clinton, Ohio

Put-In-Bay, Ohio - Raw Water Intake

This project completed in 2012, consisted of the installation of a new raw water intake line and a new submerged intake structure.  The structure was located approximately 600 feet off shore and is connected to the new water treatment plant with 12” diameter pipe.  The contract also included the installation of a new air compressor and two feed lines; air line and a chemical feed line from the new Water Treatment Plant to the inlet screen on the intake structure.  The compressed air is utilized to prevent ice build up on the intake screen.  The chemical feed line is used to control zebra mussel buildup on the intake system.

Home